Trapac Container Crane Modifications & Realignment

Location: Jacksonville, FL
Client: Trapac
Project: Crane Modification and Realignment


The crane modifications consisted of the following:

  • Raising two cranes 20 feet (6.1 meters) and extended their booms so the cranes could handle one additional container on vessels

  • Replacing the trolley rails on three cranes

  • Skidding back four cranes for realignment along the dock

 

 

lf_side_ga_749x562.jpg

Container crane raised 20 feet (6.1 meters) ready for new leg sections

lf_ls_749x562.jpg
img_1046_349x262.jpg

Lifting Frame stored between crane raises       

018_349x262.jpg

Trolley rails being replaced using GRT Specialized platform that rolls along existing rails while replacing the existing rails with new rail.