top of page
CONTECON Guayaquil SA
CRANE RELOCATION BETWEEN TWO PIERS
Location: Guayaquil, Ecuador
Client: CONTECON Guayaquil SA (CGSA)
Project: Crane Relocation
CGSA expanded their terminal operations. They ordered new cranes and installed new rail on Pier 2 so that Pier 2 could begin container handling operations. CGSA contracted GRT to move one of their cranes on Pier 1 to Pier 2 prior to the new cranes arriving. Pier 1 and Pier 2 have a 30 degree offset so we used our Containerized Truss Transport System (CTTS) for the one kilometer relocation.
bottom of page